Dishwasher Capsule Production Solution for LAB Industries Russia

TC Machinery recently supplied a large-scale TC-P660 flat-type packaging machine to LAB Industries (ЛАБ Индастриз), a Russian manufacturer of household cleaning and detergent products. The machine is designed for dishwasher capsule production, with a production speed ranging from 400 to 2,200 pods per minute.
Before shipment, the complete machine underwent a Factory Acceptance Test (FAT) at TC Machinery's workshop. The customer's representatives witnessed the testing process in person to verify whether the equipment met their production requirements.
This project demonstrates how TC Machinery provides customized dishwasher capsule packaging solutions, from equipment configuration and manufacturing to factory testing and delivery preparation.
LAB Industries (ЛАБ Индастриз) is an established Russian manufacturer operating in the household cleaning, laundry detergent, and personal care industries.
With a long history in the Russian market, the company has developed a broad product portfolio covering laundry detergents, cleaning products, dishwashing products, and other household care categories.
As a manufacturer with extensive experience in detergent production, LAB Industries requires reliable production equipment that can support its product development and manufacturing plans.
To meet its dishwasher capsule production requirements, LAB Industries selected TC Machinery's TC-P660 large-scale flat-type packaging machine.
2. Understanding Customer Production Requirements
Every detergent pod manufacturing project has its own requirements. Product specifications, chamber structure, formulation characteristics, target output, and production plans all influence equipment selection and configuration.
For LAB Industries, the project involved selecting a large-scale flat-type machine for dishwasher capsule manufacturing. TC Machinery evaluated the customer's production requirements and provided the TC-P660 solution, with a production speed ranging from 400 to 2,200 pods per minute.
During the project planning stage, several factors were considered:
-
Product Requirements: Understanding the dishwasher capsule's dimensions, shape, filling volume, and chamber structure.
-
Production Targets: Matching the machine's production capacity with the customer's planned manufacturing output.
-
Film and Formulation Compatibility: Considering the compatibility between PVA water-soluble film and the actual detergent formulation.
-
Equipment Configuration: Selecting suitable machine and mold configurations according to the product and production requirements.

3. TC-P660: Large-Scale Dishwasher Capsule Machine
4. Dishwashing Pod Product Testing and Factory Acceptance Test (FAT)
Equipment performance needs to be evaluated through actual operation and product testing. For detergent pod manufacturing projects, testing the forming, filling, and sealing processes is particularly important.
Before shipment, TC Machinery completed the assembly of the TC-P660 at our factory and arranged a Factory Acceptance Test (FAT) for LAB Industries.
During the FAT, the customer's representatives visited our workshop and witnessed the complete machine testing process. The purpose was to evaluate the equipment's operating condition and verify whether it met the agreed production requirements before packing and shipment.
The testing and verification process focused on several key aspects:
-
Dishwashing Pod Forming: Observing whether the PVA water-soluble film could be formed into the required product shape.
-
Filling Performance: Checking the filling process and evaluating whether the filling operation met the product requirements.
-
Heat Sealing: Observing the sealing process and checking the finished dishwashing pod's sealing condition.
-
Machine Operation: Evaluating the coordination of different machine processes during operation.
-
Finished Dishwashing Pods Quality: Reviewing the appearance and overall condition of the produced dishwashing pods.
By conducting product testing and a customer-witnessed FAT before shipment, TC Machinery provides customers with an opportunity to inspect the equipment and evaluate its performance under factory testing conditions.
This process also allows potential issues to be identified and discussed before the machine is delivered to the customer's production facility.
5. From Equipment Manufacturing to Delivery Preparation
-
Project Requirement Confirmation: Understanding the customer's product specifications, production capacity, and equipment requirements.
-
Equipment Design and Configuration: Preparing suitable machine and mold configurations according to the project.
-
Factory Acceptance Test: Conducting machine testing and allowing the customer to witness the equipment operation.
-
Packing and Shipment: Preparing the machine for delivery after the factory testing and verification process.
6. TC Machinery's Project Experience and Technical Capabilities
-
Requirement Analysis: Understanding customer products, production targets, and equipment expectations.
-
Customized Engineering: Developing machine and mold configurations according to product dimensions, shape, and chamber structure.
-
Manufacturing and Assembly: Completing equipment manufacturing, component installation, and machine assembly.
-
Pod Product Testing: Evaluating forming, filling, and sealing performance through product testing.
-
Technical Support: Providing installation guidance, operator training, commissioning assistance, and after-sales service.
7. Building a Reliable Dishwasher Capsule Production Solution

LION Korea Packaging Solution For Laundry And Dishwasher Pods Production
